Projects

Latest Facilities Update
Click here to read the updates as of April 2017

A Note About Buildings
Click here to read a letter from Vince Tompkins regarding facilities work.

Overview

  • Modest renovations to newly leased space in St. Ann’s & the Holy Trinity Church Parish House
  • Code, accessibility, systems and envelope upgrades
  • Focus on Community: enhanced and expanded assembly, gathering, lobby and meeting spaces
  • Renovated and expanded dining (120 to 240+ seating capacity) and expanded kitchen
  • Music classrooms and performance spaces
  • Townhouse at 124 Pierrepont renovated for Art
  • Townhouse at 122 Pierrepont fully renovated for classrooms and some offices

 

Bosworth Building

BosworthBldg2
New systems

  • Vertical risers from undercroft to roof
  • Horizontal distribution from UC to 3rd floor
  • New windows for improved function/energy

Undercroft

  • Music classrooms, practice rooms, assembly space, dance studio and “hang-out” space

1st Floor

  • Entry/security improved and accessible
  • Improve connection to Red Stair Lobby
  • Faculty dining room reconfigured
  • New nurses’ office created
  • Renovated front Ritchey Art Room

2nd Floor

  • Red Stair Lobby reclaimed for assembly
  • Major expansion of cafeteria capacity
  • Kitchen relocated and improved

3rd Floor

  • Relocate staircase to Red Stair Lobby
  • Accessible by elevator
  • New High School student space
  • New High School office

4th Floor

  • New staircase to Red Stair Lobby
Architectural Rendering of Bosworth Building Entry Level (Clinton Street to left, Pierrepont Street to right)

Architectural Rendering of Bosworth Building Entry Level (Clinton Street to left, Pierrepont Street to right)

Architectural Rendering of The Red Stair Lobby

Architectural Rendering of The Red Stair Lobby

Bosworth-Update-8-31v2

Townhouses

Townhouses
New systems
-Mechanical including ventilation for art
-Electrical upgrades
-Plumbing upgrades
-Fire protection upgrades
-New windows for improved function and energy efficiency

Connect townhouses
-Elevator accessibility all floors
-Egress (stair) improvements
-New restrooms

124 Pierrepont
-Art studios, classrooms and offices
-Limited finish improvements

122 Pierrepont
-New classrooms and administrative space
-New finishes throughout